PROJECT NEWS

Wiseton Road starting to take shape

After the slowdown over the Christmas period the exterior of the refurbished Block C is now nearly complete with internal partitioning and lining underway. The new build block A is now well out of the ground and up to second floor level with good progress being made by the bricklayers. The refurbished Block B to the rear of the site is awaiting a Slate Roof and Zinc Cladding to be installed over the next couple of weeks before internal works can commence.

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
Recent Posts
Archive
Search By Tags
  • LinkedIn - Black Circle
  • Instagram - Black Circle
  • Twitter - Black Circle

All Rights Reserved © modulor studio 2020