PROJECT NEWS

Blossoms Square project update

August 3, 2018

1/5

Our development of 13 homes in Wimbledon is coming along well. The final concrete basement retaining walls are being cast on one half of the site, as the first blockwork walls are being built on the other half. After months in the ground these houses will really begin to take their shape in the coming weeks.

 

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
Recent Posts
Please reload

Archive
Please reload

Search By Tags
Please reload

  • LinkedIn - Black Circle
  • Instagram - Black Circle
  • Twitter - Black Circle

All Rights Reserved © modulor studio 2020