PROJECT NEWS

Blenheim Terrace site visit

We are pleased to share the latest photos from our recent Blenheim Terrace site visit. The scaffolding has recently been removed and works on the external envelope are nearing completion. As predicted in our CGIs at the start of the project, the combination of light brick and warm coloured stone create a sophisticated exterior that corresponds with the surroundings of the building. Once the roof and top terraces are complete we will focus our attention on interior key features such as the main stair core balustrade. We are providing full supervision on the builders works right up until completion and client handover. This project has a high level of focus on the quality of interiors, we shall share more photos as the interior takes shape.

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
Recent Posts
Archive
Search By Tags
  • LinkedIn - Black Circle
  • Instagram - Black Circle
  • Twitter - Black Circle

All Rights Reserved © modulor studio 2020