• LinkedIn - Black Circle
  • Instagram - Black Circle
  • Twitter - Black Circle

All Rights Reserved © modulor studio 2020

PROJECT NEWS

Sewardstone Road construction stage

March 8, 2019

1/1

 

Having successfully gained full planning permission for redevelopment of a retail parade at Sewardstone Road, Northeast London, Modulor Studio are delighted to have been appointed as Architects for the construction stage of this project. The proposed remodelling of the existing building provides extended and upgraded retail units at Ground Floor level and 17 residential units over 3 storeys above. Work is due to start in April 2019 with a 12 month construction programme.

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
Recent Posts

January 21, 2019

October 17, 2018

September 14, 2018

Please reload

Archive
Please reload

Search By Tags
Please reload